Wrestling with rapid growth, Lubbock-Cooper ISD needed to expand its high school campus and provide more classroom, lab, gymnasium and dressing/locker room space. Fitting 50 additional classrooms, six new labs and two new gyms on an already large footprint and tight sight was a challenge. Also, PSC completed a utility and drainage master plan for the eastern portion of the site. After PSC helped L-CISD pass their 2014 bond, the design and construction of the project began.

The gymnasium features moveable bleachers that travel across the floor for multiple athletic practices and game configurations. Lab spaces have moveable partitions allowing collaboration with neighboring classrooms.

The project was completed ahead of schedule in November 2016. Because of the close coordination of PSC, the CMAR and the Lubbock-Cooper administrators. The project also included extensive coordination with TxDOT with regard to drainage changes that would have a significant impact on the school.