Texas 155
Anderson County, Texas
TxDOT Tyler District
Project includes converting 9.8 miles of existing two-lane rural
highway to a four-lane divided rural highway
Includes replacement of Caddo Creek bridge and new parallel twin
bridge structure at Brushy Creek (Hydrologic and Hydraulic Design)
PS&E for Phased Construction (Phase 1 - Construct two new
lanes adjacent to existing lanes. Phase 2 - Reconstruct existing
lanes to meet current design guidelines) |